First Assembly Apprenticeship Centre Opens Its Doors

First Assembly Apprenticeship Centre Opens Its Doors

The UK’s construction industry is embracing modernisation with the opening of the first dedicated training centre for Modern Methods of Construction (MMC) at Barnsley College. Developed in partnership with Laing O’Rourke and T3 Training & Development, this state-of-the-art facility is designed to equip apprentices with the skills required to assemble construction and engineering components manufactured offsite.

How the MMC Training Centre Works

The Barnsley College training centre is purpose-built to support the Level 2 Apprenticeship in Construction Assembly Installation. Approved by the Institute for Apprenticeships & Technical Education (IfATE), the programme provides hands-on training with real-world applications.

Key features of the centre include:

  • Specialist Equipment: Apprentices work with advanced tools designed for assembling large-scale modular components.
  • Safe Training Environment: A controlled workspace simulates real-world construction conditions while prioritising safety.
  • Practical Experience: Trainees gain essential skills by assembling offsite-manufactured components, preparing them for modern construction projects.

These features ensure apprentices are job-ready for careers in the UK’s growing modular construction sector.

Addressing the Skills Gap in Construction

The MMC training centre addresses a critical challenge: the UK’s construction skills shortage. Traditional construction methods are labour-intensive and face a decline in skilled workers.

Modern Methods of Construction, including modular building, offer solutions to these issues by improving efficiency and reducing waste. However, their success hinges on a workforce trained in advanced techniques and technologies. Barnsley College’s initiative ensures the industry has skilled assembly specialists ready to deliver modular projects efficiently and sustainably.

Why Modular Construction Matters

Modular construction involves manufacturing components—such as walls, floors, and roofs—in a factory setting before transporting them to a construction site for assembly.

Key Benefits:

  • Increased Efficiency: Offsite manufacturing accelerates project timelines by reducing on-site construction time.
  • Sustainability: This method minimises waste and optimises resource use.
  • Consistent Quality: Factory-controlled environments ensure components meet high-quality standards.

As modular construction gains popularity, the demand for skilled assembly specialists continues to grow, making this training centre a vital resource for the industry.

Collaboration Driving Industry Innovation

The Barnsley College training centre is the result of collaboration between Laing O’Rourke, a leader in modular construction, and T3 Training & Development. By partnering with educational institutions, Laing O’Rourke is paving the way for a skilled workforce prepared to embrace innovative methods.

Preparing Apprentices for a Bright Future

The Level 2 Apprenticeship in Construction Assembly Installation offers trainees a comprehensive introduction to modular construction.

What the Programme Offers:

  • Hands-On Learning: Apprentices train in realistic scenarios, gaining practical experience for modular construction projects.
  • Industry-Relevant Skills: The curriculum focuses on cutting-edge methods and technologies.
  • Career Opportunities: As modular construction expands, apprentices will benefit from long-term employment prospects in a high-demand sector.

Elevate your bids

We're dedicated on staying ahead with the latest news and market trends, using insights to shape your bidding strategy. Choose us for your next bid, where our comprehensive services include bid strategy, bid management, and design. With a remarkable 96% success rate in 2023, we're here to guide you seamlessly along the path to success.

Our results in 2023

Success in Numbers

96%
Success Rate
90%
Repeat Business
CONTACT US

Get in Touch

Find out how we can remove the burden of writing tender responses.

webid consult office picture