Interview multiple candidates

Lorem ipsum dolor sit amet, consectetur adipiscing elit proin mi pellentesque  lorem turpis feugiat non sed sed sed aliquam lectus sodales gravida turpis maassa odio faucibus accumsan turpis nulla tellus purus ut   cursus lorem  in pellentesque risus turpis eget quam eu nunc sed diam.

Ask for past work examples & results

Lorem ipsum dolor sit amet, consectetur adipiscing elit consectetur in proin mattis enim posuere maecenas non magna mauris, feugiat montes, porttitor eget nulla id.

  • Lorem ipsum dolor sit amet, consectetur adipiscing elit.
  • Netus vestibulum dignissim scelerisque vitae.
  • Porttitor nibh est vulputate vitae sem vitae.
  • Amet tellus nisl risus lorem vulputate velit eget.

Search for the right experience

Lorem ipsum dolor sit amet, consectetur adipiscing elit proin mi pellentesque  lorem turpis feugiat non sed sed sed aliquam lectus sodales gravida turpis maassa odio.

  1. Lorem ipsum dolor sit amet, consectetur adipiscing elit.
  2. Porttitor nibh est vulputate vitae sem vitae.
  3. Netus vestibulum dignissim scelerisque vitae.
  4. Amet tellus nisl risus lorem vulputate velit eget.
Vet candidates & ask for past references before hiring

Lorem ipsum dolor sit amet, consectetur adipiscing elit ut suspendisse convallis enim tincidunt nunc condimentum facilisi accumsan tempor donec dolor malesuada vestibulum in sed sed morbi accumsan tristique turpis vivamus non velit euismod.

“Lorem ipsum dolor sit amet, consectetur adipiscing elit nunc gravida purus urna, ipsum eu morbi in enim”
Once you hire them, give them access for all tools & resources for success

Lorem ipsum dolor sit amet, consectetur adipiscing elit ut suspendisse convallis enim tincidunt nunc condimentum facilisi accumsan tempor donec dolor malesuada vestibulum in sed sed morbi accumsan tristique turpis vivamus non velit euismod.

Denmark’s largest infrastructure project, the Femern, is a road and rail immersed tunnel being built 40 metres below the surface of the Baltic. At 18 km long, the tunnel is set to be the longest of its kind in the world. The tunnel will remove a bottleneck, reduce travel time and strengthen links between Scandinavia and Central Europe.

This new infrastructure will produce twofold benefits, enhancing road connections between the Mediterranean region and Scandinavia while enabling faster road and rail transport of freight between Scandinavia and central Europe. By creating a rail link, the tunnel will provide a more environmentally friendly form of transport and inject momentum into trade between these regions, particularly the import and export of goods.

WeBid undertook the management and development of all quality submission aspects for this highly complex civil engineering project. In addition to drafting top scoring quality responses, we developed 4D animations to enhance programme narratives. The team worked remotely and at client offices in Stockholm integrating themselves as members of the project team to create this tailored top scoring quality submission.

Tender Value
EUR 1.1 billion approx.
Key Features
  • Long term projects
  • High profile projects
  • International project
  • Joint venture
  • Deep sea/river tunnelling
  • Collaborative and co-located working with project teams
  • Multi-disciplinary
Tender Period
June – Nov 21
CONTACT US

Get in Touch

Find out how we can remove the burden of writing tender responses.